Boiler Beach & Penetangore Row S Watermain Project

Pending Council approval, the Township of Huron-Kinloss will be starting a road construction project as early as May 2026 on the following roads:

  • Boiler Beach Road from Huronville Street to Goderich St. – New watermain, new water services, storm sewer outlets and asphalt paving
  • Penetangore Row S. from Huronville Street to Saratoga Road – New watermain and water services
  • Huronville Street from Boiler Beach Road to Penetangore Row S. – New water services and asphalt paving
  • Unopened Saratoga Road Allowance from Boiler Beach Road to Penetangore Row S. – new watermain (via. directional drilling)

The Boiler Beach Road project will include the installation of a new 150mm dia. watermain, water services to the municipal property line and the replacement of existing storm drains and catch basins on Boiler Beach Road. The entire road width will be paved with new asphalt in addition to designated parking areas along the west side of the road.

The Penetangore Row S. project will include the installation of a new 200mm dia. watermain behind the existing concrete curb on the west side of the street and new water services up the municipal property line.

The purpose of the watermain project is to allow the Township to abandon the existing 50mm dia. watermain located at the rear of the properties between Boiler Beach Road and Penetangore Row S. The watermain is in poor condition and the location is undesirable for a new watermain.

All properties from #18-#30 Boiler Beach Road and the west side of Penetangore Row S. from #2-#38 will be provided with a new water service at the front of their property. See Engineered Drawings for more details.

During this project, Boiler Beach Rd and Penetangore Row S will be restricted to local traffic only. For more information, contact the Township of Huron-Kinloss or continue to check here for updates.

Project Updates

Week of May 18, 2026

Road construction will begin on May 19, 2026. The road will be closed to regular traffic from Huronville St north to the Kincardine boundary (Goderich St). Local local traffic and emergency vehicle access only. Busing companies will be notified. Any changes to pick up and drop off locations will be made by the Grey Bruce Transportation Consortium. Garbage and recycling collection will continue on its regular day and be managed by the contractor.

May 5, 2026

This project has been approved by Council and awarded to Lavis Contracting Co. Work will begin on Monday May 11, 2026.

2026 Plan

Check back here for regular project updates.

Boiler Beach Reconstruction Plan

For more information on the Master Plan of this project, see Boiler Beach Reconstruction Plan

Tender Awarded by Council

Huron-Kinloss Council has awarded the construction contract to Lavis Contracting Ltd. A start date will be forthcoming.

Provide a short summary of your question.

You have 150 characters left

Provide detailed information relating to your question.

You have 500 characters left

Select a respondent from the list that you would most like to answer your question.

Moderation Policy

These are the people that are listening and responding to your questions.

Township of Huron-Kinloss

Public Works

{{ question.username }} asked

{{question.description}}

{{ answer.respondent.name }}
| Edited

Answer this question

Select the respondent who will be marked as answering the question

Provide the answer to the question. Answer can be saved as draft and published when complete.

No questions found